Customer stories

Treatment Plant Cuts Blower Failures by 27% with Asset Infinity

Confidential client · Wastewater Management

  • 27%Blower failures reduced

Key features

This case study highlights how Asset Infinity helped a major water & wastewater treatment plant cut blower failures by 27% in just four weeks through standardized PM, calibration traceability, and centralized equipment-health insights.

  • Standardized Blower PM & Evidence Recording: Unified PM checklists for belts, bearings, lubrication, vibration, temperature, and motor inspections ensured no maintenance steps were skipped, with overdue tasks escalated automatically.
  • Calibration Control for Critical Sensors: DO sensors, airflow meters, and pressure gauges tracked through a unified calibration calendar, with digital certificates and “Do Not Use” flags preventing inaccurate readings and delayed corrections.
  • Centralized Failure Logging & Health Monitoring: Detailed technician logs with photos, readings, and RCA notes—combined with dashboards showing runtime, vibration trends, and spare-consumption patterns—enabled early failure prediction and rapid issue resolution.

See it with your own assets

A demo run on an example from your industry. Or start the trial and look around on your own.